1. Glossary

There is an endless debate among planners as to the meaning of technical terms such as goals, objectives, targets, milestones, impacts, outcomes, results, and outputs . It seems that each organization, agency, project, and individual have their own preferred set of terms. There is no right answer – the most important thing is that the members of your project team and the people with whom you work have a clear and common understanding of whichever terms you choose to use. Nevertheless, there are advantages to having a standard glossary. To this end, technical terms in this document were carefully selected, bolded when first used, consistently used thereafter, and defined in this glossary.

Guide to Glossary Entries

glossguide

Key Changes in Version 5.0

There are a couple of notable changes in terminology in CS 5.0. These include:

CMP’s CS 4.0 and earlier use target to refer to Concept A and desired future values to refer to Concept B. In contrast, global fora, such as the CBD and WCPA, use target to refer to Concept B and value to refer to Concept A. Recognizing that we cannot shift these global conventions, we are adopting their use of these words, using focal value as the replacement for what CS 4.0 called a target.

Definitions

Action ( intervention ) - A set of activities with a common focus that work together to achieve specific goals and objectives by targeting key intervention points, optimizing opportunities, and limiting constraints. A good action meets the criteria of being linked, focused, feasible, and appropriate. Compare to activity and strategy . Note: In CS 5.0, we are substituting the term “action” for the previously used term “strategy” to better fit how the rest of the world uses these terms. A strategy is now composed of one or more actions and their associated activities, results and objectives, and focal values and goals.

Activity - A set of tasks undertaken by project staff and/or partners to help implement an action.

Adaptive management The incorporation of deliberate learning into professional practice to reduce uncertainty in decision making. Specifically, it is the integration of design, management, and monitoring to enable practitioners to systematically and efficiently test key assumptions, evaluate the results, adjust management decisions, and generate learning. The Conservation Standards explicitly bring adaptive management principles into conservation practice.

Assumption ( claim, hypothesis ) - A general term used to explicitly describe what a project team believes to be true, such as the presence of a factor in a system or an assumed causal relationship between two or more factors in a situation assessment or a theory of change.

Audit - An assessment of a project or program in relation to an external set of criteria, such as generally accepted accounting principles, sustainable harvest principles, or the standards outlined in this document. Compare with evaluation.

Behavior change - The process of changing the actions people take or do, increasing, maintaining, or decreasing a current behavior, or adopting a new behavior.

Biophysical factor - A biotic or abiotic condition of a natural system that can help clarify the mechanism of how a direct threat affects a focal value. For example, inappropriate logging practices (a threat ) cause loss of stream shading (a biophysical factor), which raises stream water temperature (another biophysical factor), which then leads to lower salmon reproductive rates (a biophysical factor/ stress ) which affects a salmon population (the focal value ). Compare to stress, which is one type of biophysical factor.

Biodiversity focal value ( ecological focal value ) - A species, habitat, or ecosystem on which a project has chosen to focus. A site-based project’s chosen biodiversity focal values should collectively represent the biodiversity of concern at the site. One type of focal value.

Conservation plan ( project plan, program plan ) - The overall plan for a project or program . A complete conservation plan includes a strategic plan, monitoring plan, operational plan, and work plan.

Community of practice - A group of people who share a concern, a set of problems, or a passion about a topic, and who deepen their knowledge and expertise in this area by interacting on an ongoing basis.

Conservation practice - A process that involves a defined team agreeing on desired outcomes for a given situation and then taking action through one or more strategies designed to achieve these outcomes. The Conservation Standards provide a common framework and set of “better practices” that explicitly incorporate principles of collaboration, evidence informed conservation, and adaptive management . More broadly, a discipline that encompasses the collective people, institutions, and body of knowledge of the global conservation community.

Conservation value - See focal value . Note that this term includes not just biodiversity focal values, but also other types of focal values for conservation projects.

Contributing factor ( indirect driver ) - An indirect threat, opportunity, or other factor in a situation analysis that leads to one or more direct threats.

Critical threat - A direct threat prioritized as being important to address.

Direct threat (pressure, direct driver) - A human action that directly degrades one or more focal values (e.g., illegal logging or unsustainable fishing). It can also be a natural phenomenon altered by human activities (e.g., increase in extreme storm events due to climate change). Often tied to one or more actors. Compare with indirect threat . See discussion under pressure as to why use of direct threat can be problematic with some actors.

Diversity - In a social context, the variety of identities, experiences, and perspectives present in an organization, project, or program . See later section for a more detailed definition.

Driver - A synonym for some factors in a situation analysis ; direct drivers are generally equivalent to direct threats whereas indirect drivers are equivalent to contributing factors.

Ecosystem service - Services that intact, functioning ecosystems, habitats, and species provide that can benefit people.

Enabling condition - A factor that facilitates the effectiveness of a strategy . Typically depicted as a contributing factor in a situation model or a supporting result in a theory of change . Often an external factor that can be beyond the control of the project team, such as a legislative policy or consumer preference for sustainable products.

Equitable conservation - Conservation work that intentionally and holistically incorporates the principles of diversity, equity, inclusion, and justice (DEIJ).

Equity - Ensuring fair treatment, access, and opportunities for all individuals, while striving to identify and eliminate barriers that have historically disadvantaged certain groups. See later section for a more detailed definition.

Evaluation - Narrowly, an assessment of a project in relation to its own previously stated goals and objectives and/or external performance criteria. More broadly, an assessment of data to answer specific questions about a project’s context and strategies (see monitoring ). Compare with audit.

Evidence - Relevant data, information, knowledge, and wisdom used to answer questions, test assumptions, and inform decisions.

Evidence - informed conservation practice - The explicit and systematic generation and use of evidence to guide decision making in planning, implementing, and learning.

Factor - A generic term for an element of a situation analysis, including focal values, biophysical factors, direct threats, and contributing factors.

Focal value ( value, conservation value ) - What a project seeks to ultimately affect. Often, an element chosen to represent key aspects of the overall system. Types of focal values include biodiversity values (e.g., species, habitats, or ecosystems), climate values, cultural values, and human wellbeing values . Compare with goal, which articulates the desired future state of a focal value. Note: In CS 5.0, we are substituting the term “focal value” for the previously used term “target.” This change is to be consistent with global fora which use value for the focal element of a protected area and target for the desired future measurement of a SMART goal or objective (e.g., the 30 x 30 target).

Free, prior, and informed consent (FPIC) - This principle refers to the idea that before an action can take place that would affect a person or community positively or negatively, the person or community must give approval for the activity to move forward (“consent”). See later section for a more detailed definition.

Goal - A formal statement detailing a project’s desired impact, such as the desired future status of a focal value. A good goal meets the criteria of being specific, measurable, achievable, results oriented, and time limited (SMART). Compare to vision and objective.

Human wellbeing focal value Those components of human wellbeing on which a project has chosen to focus. In the context of a conservation project, they are often the components of human wellbeing that are linked to the status of biodiversity focal values and/or results from project strategies . Human wellbeing focal values in a project should collectively represent the array of human wellbeing needs dependent on the biodiversity focal values and/or project strategies. One type of focal value.

Impact ( ultimate outcome ) - The desired future state of a focal value . A goal is a formal statement of the desired impact.

Inclusion - The practice of creating environments where all individuals feel welcomed, valued, respected, and able to contribute fully. See later section for a more detailed definition.

Indicator – A measurable entity related to a specific information need, such as the status of a focal value, change in a direct threat, progress toward a goal or objective, or association between one or more variables. A good indicator meets the criteria of being measurable, precise, consistent, and sensitive.

Indirect threat ( indirect driver, root cause ) - A contributing factor identified in an analysis of the project situation that is a driver of one or more direct threats . Often an entry point for conservation actions . Compare with direct threat .

Information need ( knowledge gap ) - Something that people ideally should know about a project, often expressed as a question.

Interested party ( stakeholder ) - Any individual, group, or institution that has a vested interest in or can influence a project and/or that potentially will be affected by the project and has something to gain or lose if conditions change or stay the same. Interested parties are all those who need to be considered in achieving project goals and whose participation and support are crucial to its success. See later section for a more detailed definition. Compare with rights holder . Note: The term “stakeholder” has colonial associations, prompting us to shift to the more neutral term “interested party.”

Intermediate result ( intermediate outcome ) - A factor in a theory of change en route to accomplishing a goal (“intermediate” refers to its position in a logical sequence of a theory of change).

Intervention - Narrowly, a synonym for action . More broadly, a term used to refer to a collection of actions (i.e., a strategy ).

Justice – Making fair and ethical decisions about the distribution of opportunities and resources through interpersonal and institutional engagement. See later section for a more detailed definition.

Key ecological attribute (key attribute, KEA ) - An aspect of a species, habitat, or ecosystem value’s biology or ecology that, if present, defines a healthy biodiversity focal value and, if missing or altered, would lead to the outright loss or extreme degradation of that value over time. Analogous key attributes can be developed for other types of focal values.

Key intervention point - Factor within a situation analysis where a team is likely to effectively influence the situation. Logical framework ( logframe, results framework ) - A matrix that results from a logical framework analysis that is used to display a project’s actions, goals, objectives, and indicators in tabular form, showing the logic of the project.

Method - A specific technique used to collect data to measure an indicator. A good method meets the criteria of being accurate, reliable, cost-effective, feasible, and appropriate.

Milestone - An interim desired future state ( target ) for an indicator or a rating that a project team intends to achieve by a specified date, such as progress toward meeting a goal or objective . A milestone is typically a lesser amount of the target specified in the goal or objective and is to be achieved in a shorter period of time. Compare to target.

Monitoring The periodic collection and assessment of data to answer specific questions about a project’s context and strategies . Some people term this assessment of data as the “ evaluation ” component of monitoring & evaluation (M&E) or monitoring, evaluation, and learning (MEL).

Monitoring activity - A set of specific tasks that need to be completed as part of implementing a monitoring plan . Compare to activity .

Monitoring plan - Part of a conservation plan that describes a project’s information needs, indicators, and methods to collect evidence to fill these needs throughout the cycle.

Objective A formal statement detailing a desired intermediate result of a project, such as reducing a critical threat. A good objective meets the criteria of being specific, measurable, achievable, results oriented, and time limited (SMART). If the project is well conceptualized and designed, the realization of a project’s objectives should lead to the fulfillment of the project’s goals and ultimately its vision . Compare to vision and goal.

Operational plan - Part of a conservation plan that describes how a project will address its high level funding and capacity requirements, risks,, social safeguards, and long term sustainability.

Opportunity - A contributing factor identified in an analysis of the project situation that potentially has a positive effect on one or more focal values, either directly or indirectly. Often an entry point for conservation actions - for example, demand for sustainably harvested timber. In some senses, the opposite of a threat .

Outcome ( result ) - The desired future state of a factor in a theory of change . Some practitioners distinguish between intermediate outcomes ( intermediate results and their associated shorter-term objectives ) and ultimate outcomes ( impacts described by a project’s goals ).

Output The immediate product or deliverable of an activity or task, which is within the control of the implementing organization.

Partner – The individuals, groups, or institutions actively participating in and supporting the implementation of a project or program.

Pause and reflect - ( reflect and adapt, after - action review ) - As part of adaptive management, a process in which a project team analyzes actions and results to date and uses the information to adapt strategies and operations, as needed.

Practitioner – People involved in designing, managing, and monitoring conservation projects and programs .

Pressure ( direct threat, direct driver ) - This term is particularly useful in situations in which the interested parties in a project may respond negatively to having their actions being labeled as “ threats .”

Program ( initiative ) - A set of related projects or strategies designed to achieve a specific purpose. A program can be thought of as both a larger-scale project and a functional unit for managing, funding, or learning from a group of related component projects. In the interest of simplicity, this document generally uses the term “project” to represent both projects and programs since these standards of practice are designed to apply equally well to both. Compare with project.

Project - A set of strategies undertaken by a defined - group of practitioners including managers, researchers, community members, or other - interested parties to achieve defined goals and objectives . Compare with program.

Project team - A core group of practitioners who are responsible for designing, implementing, and monitoring a project . This group can include managers, researchers, operations staff, and other key implementers or interested parties.

Psycho social (psychological and social) states - The beliefs, attitudes, feelings, and other cognitive states that underlie why people behave in a certain way.

Result ( outcome ) - The desired future state of a factor in a theory of change. Most commonly a shorthand for intermediate result but could include the desired condition of a focal value.

Results chain ( theory of change diagram, strategy - pathway ) - A visual diagram of the theory of change for a strategy that shows the causal sequence linking one or more project actions to their expected intermediate results and one or more focal values. Often used to show key assumptions.

Rights holder - An individual or group who has legal or customary ownership and/or use of lands and waters and/or natural resources within an area. All rights holders are also interested parties in a project affecting the area, but not all interested parties are rights holders.

Risk - The possibility that an event will occur that will adversely affect one or more interested parties and/or a project’s achievement of its goals and objectives. It is often expressed in terms of a combination of the likelihood of the event’s occurrence and the severity of its consequences.

Root cause - A type of factor in a situation analysis ; root causes are generally equivalent to contributing factors.

Scope - The broad geographic and / or thematic focus of a project. Scope defines what the project intends to affect but does not necessarily limit where actions that affect the scope take place.

Situation analysis ( situation assessment ) - A process that helps a project team and partners create a common understanding of the project’s context – including the relationships among the biological environment and the social, economic, political, and institutional systems and associated actors that affect the focal values to be conserved.

Situation model ( conceptual model ) - A visual diagram of a situation analysis . A situation model represents relationships among key factors identified in a situation analysis, which affect one or more of the project’s focal values. A good model should link the project’s focal values to threats, opportunities, and key intervention points.

Social safeguards - Measures or policies designed to protect individuals and communities from adverse impacts, particularly in the context of conservation and development projects, policies, or social programs. These safeguards aim to ensure that the rights, wellbeing, and interests of vulnerable or marginalized groups are respected and protected.

Stakeholder - See interested party.

Strategic plan – Part of a conservation plan that describes a project’s scope, situation, and strategies, as well as how its actions will achieve its objectives and goals.

Strategy – One or more actions and their associated activities, results and objectives, and focal values and goals. Often represented in a theory of change diagram. Note: In CS 5.0, we have substituted the term “action” for the previously used term “strategy” to better fit how the rest of the world uses these terms. An action is now a component of a broader strategy.

Stress – An impaired aspect of a biodiversity focal value that results directly or indirectly from human activities. For example, low population size or birth rates (for a species) or reduced water flows or increased sedimentation (for a river ecosystem). Generally equivalent to a degraded key ecological attribute ; is one type of biophysical factor.

Target - The desired future measurement or rating category for an indicator that a project team intends to achieve. Often the quantitatively or qualitatively measurable element of a SMART goal or objective. Note: In CS 5.0, we have changed the use of the term “target” from its previous definition as “a factor in the system that a project team ultimately cares about.” This change is to be consistent with the Convention on Biological Diversity and other international fora which use “value” for the focal element of a protected area and “target” for the desired future measurement of a SMART goal or objective (e.g., the 30 x 30 target).

Target audience - A specific group of individuals a project is seeking to influence or inform. A target audience may be those causing or contributing to direct threats (e.g., illegal fishers, commercial farmers, policy makers) and/or they may be those supporting or contributing to a project (e.g., partners, donors, general public).

Task - Specific work required to implement an activity, monitoring activity, or other components of a work plan .

Theory of change - A series of causally linked assumptions about how a team thinks its actions will help it achieve both intermediate results and ultimate impacts . A theory of change can be expressed in text, diagrammatic (e.g., results chains ), or other forms.

Threat – See direct threat, indirect threat, and pressure .

Value – See focal value.

Vision – A description of the desired state or ultimate condition (associated with the project scope ) that a project is working to achieve. A good vision meets the criteria of being relatively general, visionary, and brief.

Work plan – Part of a conservation plan that describes the implementation of strategic, monitoring, and operational plans. Work plans typically list activities and tasks, as well as responsible individuals and timing of each activity or task. They often link to budgets, showing the money and resources required to implement the work plan.

TOC Visual Key

toc

Equitable Conservation Terms

Detailed Information on Terms related to Equitable Conservation

Diversity In a social context, the variety of identities, experiences, and perspectives present in an organization, project, or program. These include, but are not limited to: race, ethnicity, sexual orientation, gender, disability, Native or Indigenous origin, age, culture, religion, socio economic status, appearance, language and accent, education, geography, nationality, lived experience, job function, personality type, and thinking style. Diversity may also be used to refer to the variety of groups or organizations involved in conservation work (e.g., volunteers, elders, community representatives).

Equity Ensuring fair treatment, access, and opportunities for all individuals, while striving to identify and eliminate barriers that have historically disadvantaged certain groups. Equity recognizes that different people have different needs and may require different resources to achieve equal outcomes. Equity focuses on creating a level playing field, acknowledging that not everyone starts from the same place and that adjustments may be needed to achieve fairness. Equity is a prerequisite for reaching equality in practice.

Free, prior, and informed consent (FPIC) – This principle refers to the idea that before an action can take place that would affect a person or community positively or negatively, the person or community must give approval for the activity to move forward (“consent”). However, the person or community must have full information regarding the activity; otherwise, the consent would be meaningless, as it would not be based on adequate information about the proposed activity and its potential impact (“informed”). The person or community must also provide the consent before the activity begins (“prior”). And it is also critical that the person or community not feel any pressure or coercion to agree to the activity (“free”).

Inclusion – The practice of creating environments where all individuals feel welcomed, valued, respected, and able to contribute fully. Inclusive conservation acknowledges and supports the rights, needs, visions, voices, and leadership of diverse identity groups (especially local and Indigenous groups) in the protection and management of nature. It involves actively inviting and involving diverse individuals in all aspects of an organization or community. While diversity is about representation, inclusion is about creating a culture where diverse individuals feel welcome and their contributions are valued. It’s the “how” of making diversity work.

Interested party - Any individual, group, or institution that has a vested interest in or can influence a project and/or that potentially will be affected by project activities and has something to gain or lose if conditions change or stay the same. Interested parties are all those who need to be considered in achieving project goals and whose participation and support are crucial to its success. The term “interested” denotes parties that may affect or be affected by the project’s work in the system. It does not mean the party is actively engaged or even aware of the work. Interests may be financial, moral, legal, personal, or community based, and may be direct or indirect. While influence is one aspect of interest, we include a broader definition to mitigate the potential for neglecting those who have strong interests but have no power or influence.

Justice – Making fair and ethical decisions about the distribution of opportunities and resources through interpersonal and institutional engagement. Justice goes beyond equity by seeking to address and dismantle systemic inequalities and discriminatory practices. It involves changing structures, policies, and practices that perpetuate disparities and advocating for sustained social change. Justice is about long – term change ensuring that the conditions and systems that created inequality are transformed. It involves the “why” and “what next” in addressing root causes of inequity. In conservation, a justice approach involves treating interested parties equitably and inclusively, so that they feel safe and secure to participate. Justice also means increasing diverse representation in the planning and implementation of conservation projects and programs.

Social safeguards Measures or policies designed to protect individuals and communities from adverse impacts, particularly in the context of conservation and development projects, policies, or social programs. These safeguards aim to ensure that the rights, wellbeing, and interests of vulnerable or marginalized groups are respected and protected.

2. Key Terms

Descriptions of Criteria for Key Terms

Vision Statement: A general statement of the desired state or ultimate condition (associated with the project scope) that a project is working to achieve

Relatively General Broadly defined to encompass all project activities - Visionary – Inspirational in outlining the desired change in the state of the focal values towards which the project is working - Brief – Simple and succinct so that all project participants can remember it

Goal: A formal statement detailing a project’s desired impact, such as the desired future status of a focal value

Objective: A formal statement detailing a desired intermediate result of a project, such as reducing a critical threat Good goals and objectives should meet the following SMART criteria:

Specific Clearly defined so that all people involved in the project have the same understanding of what the terms in the goal or objective mean – Measurable Definable in relation to some standard scale (numbers, percentage, fractions, or all/nothing states)

Action: A set of activities with a common focus that work together to achieve specific goals and objectives by targeting key intervention points, optimizing opportunities, and limiting constraints

Indicator: A measurable entity related to a specific information need, such as the status of a focal value, change in a threat, progress towards a goal or objective, or association between one or more variables

Method: A specific technique used to collect data to measure an indicator

3. General Principles & Considerations

There are some essential principles that apply to all steps in the Conservation Standards. Instead of listing them for each step, we describe them here.

General Principles

Considerations
As you review and implement the Conservation Standards, keep in mind the following considerations:

4. Standards Summary

Numbers denote steps and sub steps, and diamond bullets ( ) denote outputs. Not all standards or outputs are appropriate under all conditions or for all projects, so you should adapt as needed.

1. Assess

1A. Define Purpose & Identify Project Team

Identification of purpose, decision makers, decision-making process, and decisions needed

Identification and engagement of interested
parties and support for their participation where barriers exist

Selection of initial project team, including project leader, core members, and advisory members

Identification of existing skills among team
members and key gaps you should fill

Designation of roles and responsibilities

1B. Define Scope, Vision, & Focal Values

Brief description of the project scope, including a map, if appropriate

Vision statement for the project

Selection of biodiversity focal values, including a brief explanation of why they were chosen, and if appropriate, a description and/or map showing each focal value’s location

Selection of human wellbeing focal values and identification of ecosystem services, as relevant

Description of the viability status of each priority biodiversity focal value

1C. Identify Critical Threats

Identification of direct threats and, if relevant, a map showing the spatial footprint for critical threats as they intersect focal values

Identification of the biophysical effects of climate threats and interactions among climate and conventional threats

Rating or ranking of direct threats to identify critical threats

1D. Assess the Conservation Situation

Identification and analysis of indirect threats and opportunities

Assessment of interested parties and their primary interests

Situation analysis and/or model, narrative description, and/or other representation of key cause-and-effect relationships among factors affecting your project context

**2. Plan **

2A. Develop a Formal Strategic Plan: Goals, Actions, Assumptions, & Objectives

Goals for each biodiversity focal value and, if appropriate, human wellbeing focal value

Identification of key intervention points and draft actions

Prioritization of draft actions

Theories of change that clarify assumptions about how actions and associated activities lead to expected results

Objectives for key intermediate results

Finalized strategic plan

2B. Develop a Formal Monitoring, Evaluation, & Learning Plan

Audiences and their information needs and preferred communication modes clearly defined

Indicators and methods identified

Finalized monitoring, evaluation, and learning plan

2C. Develop an Operational Plan

Assessment of human, financial, and other resources

Risk assessment and mitigation actions

Social safeguards

Estimate of project lifespan and transition strategy

3. Implement

3A. Revisit Team Structure and Process

Updated team charter and other partnership agreements, as relevant

Updated communications strategy stating how you will keep interested parties engaged as to your progress

3B. Develop a Detailed, Short-term Work Plan and Timeline

Work plan detailing the activities, tasks, and responsibilities associated with your strategic, monitoring, and operational plans

Project timeline or calendar

3C. Develop and Refine Your Project Budget

Project budget

List of potential funding sources

Funding proposals developed and submitted

3D. Implement Your Plans

Implementation of strategic, monitoring, and operational plans (as outlined in your work plan), keeping in mind your project budget and schedule

Systems for storing and accessing data

Monitoring data captured in systems

Implementation progress reports to your organization, funders, and other interested parties

4. Analyze & Adapt

4A. Prepare Your Data for Analysis

Key project data recorded, stored, processed, and backed up on a routine basis

Visualizations of key data for decision making

4B. Analyze & Reflect on Results

Analyses of project results and assumptions

Analyses of operational and financial data

Record of discussions and decisions

4C. Adapt Your Plans and Budgets

Revised project documents, such as your strategic plan (including situation model and theories of change), monitoring plan, operational plan, work plan, and budget

Documentation of evidence, discussions, lessons learned, potential risks or uncertainties, and decisions

5. Share

5A. Document What You Learn

Documentation of key results and knowledge

5B. Share What You Learn

Refinement, as needed, of key audiences and their information needs and preferred communication modes

Regular communication to project team members, partners, and interested parties

Contribution to evidence base

Development and distribution of appropriate communication products

5C. Foster a Learning Environment

Regular feedback shared formally or informally

Audits, as appropriate, to assess adherence to good conservation practice

Demonstrated commitment from leaders and staff to create a safe environment for learning and innovation

A commitment to share successes and failures with practitioners around the world Close the Loop*

References
  1. Salafsky, N., Mejía Cortez, P., de Meyer, K., Dudley, N., Klimmek, H., Lewis, A., MacRae, D., Mitchell, B. A., Redford, K. H., & Sharma, M. (2024). A standard lexicon of terms for areabased conservation version 1.0. Conservation Biology, 38(4). 10.1111/cobi.14269
  2. Salafsky, N., Boshoven, J., Burivalova, Z., Dubois, N. S., Gomez, A., Johnson, A., Lee, A., Margoluis, R., Morrison, J., Muir, M., Pratt, S. C., Pullin, A. S., Salzer, D., Stewart, A., Sutherland, W. J., & Wordley, C. F. R. (2019). Defining and using evidence in conservation practice. Conservation Science and Practice, 1(5). 10.1111/csp2.27